Saturday, May 24, 2008

Frame Stage 1

Well the power is still out, but the guys are bringing in generators of some sort to keep the job going. This week saw the frame arrive with the ground floor up. Next week I suspect the upper story to be up with roof trusses. Then I cough up more $$$.

Garage to be.


Entry


View standing back in Family area, looking into Kitchen area.


View standing in Kitchen across to Family room wall where Jet-Master will be installed. Double door opening to Media room.


View to rear elevation. Alfresco, Kitchen, Meals, Family & Media.


View from back right corner of block. Can see media room with 2 long vertical windows on the rear elevation, and the long slim horizontal window on side elevation.


View from in the Alfresco

No comments: